PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Caulking Curtain Wall Mockup Facing MAST Trailer (800x600).jpg Stripping Shear Wall Panels at Elev. 1,2,3 Facing South-East (800x600).jpg Concrete prep. Facing North-East(800x600).jpg Footing area at Elev. 7, Stair -4,-5 Facing North (800x600).jpg Poured wall forms at Column Line L-M Facing North-East (800x600).jpg Setting up the Curtain wall Mockup next to MAST Trailer (800x600).jpg Stripping Shear wall forms at Elev. 1,2,3 Facing North-East (800x600).jpg Wall Froms at Monumental Stairs Facing East(800x600).jpg
Previous pageNext page Poured wall forms at Column Line L-M Facing North-East (800x600)
Poured wall forms at Column Line L-M Facing North-East (800x600)